PacificSource HQ 555

Posted Posted in Case Studies

Schedule: Aug 2019 to Aug 2020. General Contractor: Swinerton Project Details and Challenges: The project scope included tenant improvements on occupied suites measuring approximately 175,000 square feet of a 2-story building as well as some selective improvements to the core and shell. The project was on a tight schedule and we were contracted later in […]

Design/Build Overhead Paging

Posted Posted in Case Studies

Legacy Voice Paging System Overviews Legacy Meridian Park Challenges: The challenges faced at MPMC were basic- the existing legacy paging system was failing due to age and lack of documentation on system design. Solution: MPMC Facilities provided ISG with a terrific alternative to use the existing fire alarm system as a backup paging solution during […]